Cabin
Linwood, MD
    This odd cabin was moved and put together by others.  We then plastered the walls with blueboard lath and veneer basecoat plaster, and completed with a smooth finish plaster.
    The ceilings were blueboard installed with screws.  Then an electrician installed a radiant heat cable on the ceiling blueboard.  The wattage was determined by the Power Co. for each room.
    Over the cable and blueboard lath we applied three eights inch (3/8") of veneer radiant heat basecoat plaster.  Finally, a smooth finish plaster was applied to the ceilings.  The finished plaster was done in a rustic, blemished style to match the time period of the cabin.
 